Marolt Ranch Housing
The blocks of units were aligned against a natural bank on the west side of the site, to lessen their physical impact, and to leave an open- campus-like space overlooking the river. The buildings are designed to be inconspicuous as a group, but have an accessable human scale that is sensitive to the mining town context of the city.
Project Directory
Architect:
Harry Teague Architects, Harry Teague, Christopher Melton
Structural Engineer:
Pattillo Associates Engineers, Inc., 715 Grand Avenue, P.O. Box 751, Glenwood Springs, CO 81602
Contractor:
Colorado First Construction Co., Suite 204 Firstbank Center, 160 Hwy 6, Drawer 1099, Silverthorne, CO 80498
Civil Engineer:
Schmueser, Gordon, Meyer, 1512 Grand Avenue #212, Glenwood Springs, CO 81602
Landscape Planning:
Design Workshop, Inc., 120 E. Main Street, Aspen, CO 81611
Kitchen Consultant:
Thomas Rica Associates, 6087 S. Quebec Street, Denver, CO
Photographers:
Gordon H. Schenk, Jr., 1317 Harding Place, P.O. Box 35203, Charlotte, NC 28235
Harry Teague Architects